Works have started on the stabilisation of the southern bank of the Bell River, adjacent to Pioneer Park in Wellington, that was severely eroded as a result of repeated flood events in 2022.
Stabilisation works will involve rock armouring of the southern bank to prevent further erosion and to protect the Pioneer Park sporting precinct.
Works will start from the bottom of the existing weir and ex...